Wanchai District Court Tower
The Hong Kong Academy for Performing Arts
Grandstand II, Shatin Racecourse
Members Clubhouse, Shatin Racecourse
New Private Independent School at Shum Wan Road, Aberdeen
Rehabilitation Block at Tuen Mun Hospital at Tsing Chung Koon Road, Tuen Mun
Extension Facilities for the Clinical Department of the Medical Faculty at Prince of Wales Hospital at Shatin
Redevelopment of Marymount Primary School and Improvement of Marymount Secondary School at Happy Valley
School for Hon Wah Educational Organisation, Siu Sai Wan
Beautification of Tsim Sha Tsui Promenade
King Tai Court
Eastern Harbour Crossing Site Phase 5 & 6
Kwai Shing Circuit
Bauhinia Garden, Tseung Kwan O
Yau Tong Centre
Yi Fung Court, Kwai Chung
Ma Hang Estate Phase 3
Ma On Shan Area 77
Tuen Mun Area 18
Tseung Kwan O Area 33/34 Phase 3
Sheung Tak Shopping Centre, Tseung Kwan O
Hang Tsui Court, Chai Wan
Fu Tung Estate, Tung Chung
Yu Tung Court, Tung Chung
Wanchai District Court Tower
This project includes the construction of one block of 32-storey court house and office building with underground carpark.
Institutional and Commercial Buildings
The Hong Kong Academy for Performing Arts
The project comprises the construction of two triangular-linked blocks comprising a 5-storey academic block and a 6-storey theatre block.
Institutional and Commercial Buildings
Grandstand II, Shatin Racecourse
The project comprises the construction of a 12-storey central grandstand building and a 3-storey carpark.
Institutional and Commercial Buildings
Members Clubhouse, Shatin Racecourse
The project comprises the construction of an 8-storey Members Clubhouse, a 9-storey carpark and an outdoor swimming pool.
Institutional and Commercial Buildings
New Private Independent School at Shum Wan Road, Aberdeen
Construction of a twelve-storey integrated secondary and primary school building including all structural works, architectural works, provision of general finishes, built-in furniture and building services installation.
Institutional and Commercial Buildings
Rehabilitation Block at Tuen Mun Hospital at Tsing Chung Koon Road, Tuen Mun
Construction of a 15-storey rehabilitation block including all associated building service works, fitting out and finishing works, underground drainage and external works and the fitting out works to a new link bridge.
Institutional and Commercial Buildings
Extension Facilities for the Clinical Department of the Medical Faculty at Prince of Wales Hospital at Shatin
Construction of one 14-storey L-shaped Extension Building with 8-storey structural steel link bridge connecting the existing hospital block and all the associated utilities diversion, underground drainage and external works.
Institutional and Commercial Buildings
Redevelopment of Marymount Primary School and Improvement of Marymount Secondary School at Happy Valley
Construction of a new nine storey school block, a link bridge connecting the existing school building, all additions and alternation works to the existing secondary school and including all associated drainage works.
Institutional and Commercial Buildings
School for Hon Wah Educational Organisation, Siu Sai Wan
Construction of a new seven storey composite school building of 37 classrooms including pile construction, substructure, superstructure, finishing and fittings, building services, underground drainage and external works.
Institutional and Commercial Buildings
Beautification of Tsim Sha Tsui Promenade
Beautification and modification of the Tsim Sha Tsui Promenade area including all associated building services installation.
Institutional and Commercial Buildings
King Tai Court
Construction of one 33 storeys non-standard domestic block, one single storey building enclosure to existing sewage pumping station, all associated underground drainage and external works.
Public Housing
Eastern Harbour Crossing Site Phase 5 & 6
Phase 5: Construction of two 41 storey site specific Blocks and one 5-storey Carpark and Welfare Facilities Block including foundation; design and build one steel pedestrian footbridge, covered walkway and noise barrier, one pedestrian network with lift tower, one suspended deck.
Public Housing
Kwai Shing Circuit
Construction of two 39-41 storeys blocks, one community garden, two steel pedestrian footbridges, all associated site formation, mini-pile, drainage and external works.
Public Housing
Bauhinia Garden, Tseung Kwan O
The design and construction of eight 41-storey residential towers providing 3,200 units with carparks, shops, a kindergarten, swimming pool, ball courts as well as hard and soft landscaping works.
Private Sector Participation Scheme (PSPS)
Yau Tong Centre
Private Sector Participation Scheme (PSPS)
Yi Fung Court, Kwai Chung
This project includes the construction of two 35-storey new cruciform blocks on a 3-storey carpark podium, one lift tower and two footbridges, an external escalator and staircase, and all associated drainage and external works.
Public Housing
Ma Hang Estate Phase 3
This project includes the construction of one seven-storey primary school, one seven-storey commercial centre, reconstruction of a three-storey Murray House, a bay viewing terrace cantilevered out over the seawall, all associated drainage and external works, as well as road and drainage works at Carmel Road extension.
Public Housing
Ma On Shan Area 77
This project includes the construction of five blocks of 32-35-storey residential towers with a two-storey carpark podium including a Club House and all building services and external works.
Public Housing
Tuen Mun Area 18
Construction of two nos. 33-storey non-standard domestic blocks, one 2-storey community hall, one single storey refuse collection point, all associated underground drainage and external works.
Public Housing
Tseung Kwan O Area 33/34 Phase 3
This project includes the construction of two 31-storey Concord 2 Blocks (Home Ownership Scheme, which was completed in June 1999), one 3-storey commercial centre, one 1-storey Main Telecommunications and Broadcasting Equipment Room, upgrading of Ming Tak Shopping Arcade including roof enclosure and associated building services, and all associated drainage and external works.
Public Housing
Sheung Tak Shopping Centre, Tseung Kwan O
This project includes the construction of the 4-storey Sheung Tak Shopping Centre containing shops, a market, bus terminus and roof terrace, two footbridges linking to Phase 5 and Phase 6, the design and construction of an amphitheatre including a performance stage and steel roof, and all associated drainage and external works.
Public Housing
Hang Tsui Court, Chai Wan
This project includes the construction of two 35-storey New Cruciform Blocks and one 6-storey carpark. Aluminium formwork (the "Mascon System" from Canada) was utilised to construct the walls and slabs of the domestic blocks. As an alternative to timber formwork, the aluminium formwork was reuseable and environment-friendly, and it could reduce the amount of refuse on sites.
Public Housing
Fu Tung Estate, Tung Chung
This project includes the construction of one Harmony Type One 31-storey block, two Harmony One 34 & 37-storey blocks, one 3-storey carpark building including all associated drainage and external works.
Public Housing
Yu Tung Court, Tung Chung
This project includes the construction of five Harmony Type One blocks that are of 39, 37, 34, 31 and 29 storeys respectively and all external drainage works.
Public Housing