    • Yau Tong Centre

      Private Sector Participation Scheme (PSPS)

    • Yi Fung Court, Kwai Chung

      This project includes the construction of two 35-storey new cruciform blocks on a 3-storey carpark podium, one lift tower and two footbridges, an external escalator and staircase, and all associated drainage and external works.

      Public Housing

    • Ma Hang Estate Phase 3

      This project includes the construction of one seven-storey primary school, one seven-storey commercial centre, reconstruction of a three-storey Murray House, a bay viewing terrace cantilevered out over the seawall, all associated drainage and external works, as well as road and drainage works at Carmel Road extension.

      Public Housing

    • Ma On Shan Area 77

      This project includes the construction of five blocks of 32-35-storey residential towers with a two-storey carpark podium including a Club House and all building services and external works.

      Public Housing

    • Tuen Mun Area 18

      Construction of two nos. 33-storey non-standard domestic blocks, one 2-storey community hall, one single storey refuse collection point, all associated underground drainage and external works.

      Public Housing

    • Tseung Kwan O Area 33/34 Phase 3

      This project includes the construction of two 31-storey Concord 2 Blocks (Home Ownership Scheme, which was completed in June 1999), one 3-storey commercial centre, one 1-storey Main Telecommunications and Broadcasting Equipment Room, upgrading of Ming Tak Shopping Arcade including roof enclosure and associated building services, and all associated drainage and external works.

      Public Housing

    • Sheung Tak Shopping Centre, Tseung Kwan O

      This project includes the construction of the 4-storey Sheung Tak Shopping Centre containing shops, a market, bus terminus and roof terrace, two footbridges linking to Phase 5 and Phase 6, the design and construction of an amphitheatre including a performance stage and steel roof, and all associated drainage and external works.

      Public Housing

    • Hang Tsui Court, Chai Wan

      This project includes the construction of two 35-storey New Cruciform Blocks and one 6-storey carpark. Aluminium formwork (the "Mascon System" from Canada) was utilised to construct the walls and slabs of the domestic blocks. As an alternative to timber formwork, the aluminium formwork was reuseable and environment-friendly, and it could reduce the amount of refuse on sites.

      Public Housing

    • Fu Tung Estate, Tung Chung

      This project includes the construction of one Harmony Type One 31-storey block, two Harmony One 34 & 37-storey blocks, one 3-storey carpark building including all associated drainage and external works.

      Public Housing

    • Yu Tung Court, Tung Chung

      This project includes the construction of five Harmony Type One blocks that are of 39, 37, 34, 31 and 29 storeys respectively and all external drainage works.

      Public Housing

    • Fu Tung Shopping Centre, Tung Chung

      This project includes the construction of one 3-storey commercial centre, one 2-storey clinic block, two primary schools, two secondary schools, one 2-storey Central Refuse collection system building, together with all associated drainage and external works.

      Public Housing

    • Kam Fung Court, Ma On Shan Area 90 Phase II

      This project comprises the construction of three 39-storey Harmony-Type 1 Blocks and ancillary works which include remedial works of preloading and installation of vertical drains and all associated external drainage works.

      Public Housing

    • Kam Fung Court, Ma On Shan Area 90 Phase IV

      This project includes the construction of three 39-storey Harmony One blocks, one 7-storey primary school, all associated drainage and external works, remedial works for marine clay hard landscaping, covered walkway, etc.

      Public Housing

    • Chung On Estate, Ma On Shan

      Public Housing

    • Ma On Shan Area 77 Phase 2

      This project includes the construction of five blocks of 41-storey Single Aspect blocks, one 7-storey commercial / carpark block, an Automatic Refuse Collection System for Blocks 8-12, with all associated drainage and external works.

      Public Housing

    • Tin Shui Wai Area 31 Phase II

      This project includes the construction of five 41-storey Concord 1 Home Ownership Scheme Blocks and all associated drainage and external works.

      Public Housing

    • Lok Fu Shopping Centre Phase II, Lok Fu

      This project includes the construction of a 7-storey commercial block, a basement carpark and a glass atrium.

      Public Housing

    • Heng On Estate Phase I, Ma On Sha

      This project includes the construction of three Trident Blocks, one New Slab Block, two primary schools, one secondary school, and all associated external works.

      Public Housing

    • Hong Kong Housing Authority Exhibition Centre, Homantin

      This project includes the construction of a two-storey exhibition hall using structural steel member and prefabricated panels.

      Public Housing

    • Tin Yiu Estate Phase 3, Tin Shui Wai

      This project comprises the construction of three 37-storey Harmony-Type 2 Blocks, one shopping centre, one primary school, bus terminus, pedestrian footbridge, and all associated drainage and external works.

      Public Housing

    • Un Chau Street Estate
      Phase 3

      This project includes the construction of three 41-storey Harmony 1 Rental Blocks, one 6-storey Commercial Centre and Housing for Senior Citizen Block, one covered footbridge spanning between the lorry carpark block in Phase 1 and the Commercial Centre, and all associated services drainage and external works.

      Public Housing

    • Serenity Place,
      Tseung Kwan O

      This project includes the construction of four 41-storey and one 40-storey residential towers on top of a 3-storey carpark podium, including all building services and external works.

      Public Housing

    • Homantin South Phase 3

      This project includes the construction of five 40-storey H1 Harmony Blocks, with a total of 3,955 flats, an escalator tower, covered walkway, performance stage, external works & associated drainage works.

      Public Housing

    • Mock-up Centre for PRH & HOS Modular Flats

      Public Housing