• Our accredited and award - winning construction
    business marked the origin of SOCAM.

  • Grid

  • List

Filter By :

    • (Design and Build) North Point Government Offices

      Being one of the design-and-build projects of Shui On, the work comprises the design and construction of a 26-storey office building for various government departments including reclamation, bored piling, external works and all associated building services works.

      Institutional and Commerical Buildings

    • Murray House

      The rebuilding of the Victorian-era Murray House was the first and the largest historic building reconstruction project in Hong Kong. While re-erecting and adding new life to this 150-year-old building, extreme care was taken in the reconstruction process to ensure precise computation and placement of original stones materials.

      Institutional and Commerical Buildings

    • (Design and Build) Independent Commission Against Corruption Headquarters Building, North Point

      This project comprises the design and construction of a multi-storey building for the Independent Commission Against Corruption (ICAC) Headquarters.

      Institutional and Commerical Buildings

    • (Design and Build) Manulife Tower, North Point

      A 42-storey commercial and office building of which 37 storeys are office premises and 5 storeys are retail and parking space with a total GFA of 40,000 square metres.

      Institutional and Commerical Buildings

    • (Design and Build) Senior Staff Quarters of City University of Hong Kong

      The works comprise the design and construction of two 8-storey residential towers with carparking facilities including hard and soft landscaping, relocation of tennis courts and all associated external drainage works.

      Institutional and Commerical Buildings

    • (Design and Build) Richland Gardens, Kowloon Bay

      Being Shui On's first design-and-build Private Sector Participation Scheme project, this includes the construction of eight blocks of 33-storey and 14 blocks of 34-storey residential towers and a commercial and car park complex.

      Private Sector Participation Scheme (PSPS)

    • Aberdeen Marina Club, Aberdeen

      The project comprises the construction of a 10-storey building with carpark, shops and boat-storage block, and a five-storey block with shops and restaurants.

      Institutional and Commerical Buildings

    • Public Rental Housing Development at Wing Tai Road, Chai Wan

      Construction of a 37 storey domestic block includig all associated underground drainage and external work.

      Public Housing

    • The Murray

      Is an iconic 5-star luxury hotel in Hong Kong, evolved from the historic Murray Building in the “Conserving Central” Government initiative. Pat Davie was commissioned to design and carry out fitting-out works in parts of the hotel.

      Interior Fitting Out

    • Sports Centre, Community Hall and District Library in Area 14B, Sha Tin

      Construction of a 4-storey sport centre and a 6-storey community hall and district library including design and construction of piled foundation, structural and finishing work, all E&M and associated external and soft landscaping works.

      Institutional and Commerical Buildings

    • Relocation of the Department of Justice to Central Government Offices (Main and East Wings)

      Refurbishment work to the existing eight-storey Main Wing and seven-storey East Wing of the former Central Government Office including associated E&M works, historic building preservation, landscaping, underground drainage and external works.

      Institutional and Commerical Buildings

    • Pamela Youde Nethersole Eastern Hospital Nurses Training School & Quarters and Senior Staff Quarters, Chai Wan

      The works comprise the construction of four 17-storey interlocking blocks, three high-rise blocks sitting on a common podium, as well as one 23-storey block and one 13-storey block.

      Institutional and Commerical Buildings

    • Radiotherapy Centre and Accident & Emergency Department at Princess Margaret Hospital

      Construction of a 12-storey block to house the Radiotherapy centre, the Accident & Emergency Department and other services with a total construction floor area of 22,883 square metres.

      Institutional and Commerical Buildings

    • Castle Peak Hospital Redevelopment Phase II Stage 2

      (1) Demolition of existing Block E & F, G & H and other miscellaneous structures; (2) Construction of a 5-storey Block E with a 5.3 metre depth basement & a 3-storey Block S (including design of piling & caps); and (3) Construction of miscellaneous structures including associated drainage and external works.

      Institutional and Commerical Buildings

    • Building 7&8, Hong Kong Science Park

      Construction of two seven-storey office buildings for research and development activities with a common basement for carparking and plant rooms, a service tunnel adjoining buildings including associated drainage and external works.

      Institutional and Commerical Buildings

    • Welfare Complex at Lai King Headland, Lai Chi Ling Road, Kwai Tsing

      Construction of a 9-storey purpose built building consisting of 400-place long stay care home, 80-place halfway house & 120-place sheltered workshop, including retaining wall and slope cutting works and associated drainage and external works.

      Institutional and Commerical Buildings

    • Primary and Secondary School in Area 20 and Two Secondary Schools in Area 40, Tung Chung

      Construction of One Primary School and Three Secondary Schools (ASD 2000 design, 30 classrooms) including the design and construction of the piled foundation and a structural system for the superstructure of the school blocks, and all associated building services installation; drainage and external works.

      Institutional and Commerical Buildings

    • Departmental Quarters at Hong Ning Road

      This project includes the design and construction of two residential blocks with landscaped podium and residents' clubhouse providing 584 government quarters and 156 private car parking spaces, including the piled foundation, building services, underground drainage, external and landscaping works.

      Institutional and Commerical Buildings

    • Castle Peak Hospital Redevelopment Phase 2 Stage 1

      This project includes the construction of one five-storey building, one two-storey building, a single-storey building services unit, a single pump house, a building services tunnel, demolition of an existing administration block as well as associated drainage and external works.

      Institutional and Commerical Buildings

    • Queen Mary Out-patient Clinic

      This project includes the construction of one 15-storey new Specialist Out-patient Clinic block and all associated building service installation and external works, modification of existing traffic circulation platform including two new link bridges of steel structure, an extension of a covered walkway and all associated building services and alternation works.

      Institutional and Commerical Buildings

    • Princess Margaret Specialist Outpatient Clinics

      This project includes the construction of one 11-storey specialist outpatient clinics, a reinforced concrete link bridge connecting to existing Nursing Staff Quarters, underground pump house and sump tanks, reinstatement of existing basketball court and minor alteration works to second floor of existing Nursing Staff Quarters including all associated building services and external works.

      Institutional and Commerical Buildings

    • The Jockey Club Serene House of Castle Peak Hospital

      This project includes the construction of a new two-storey building including footing, associated building services, drainage and external works.

      Institutional and Commerical Buildings

    • MTRC Lantau and Airport Railway Main Depot in Siu Ho Wan

      MTRC Lantau and Airport Railway Main Depot in Siu Ho Wan

      Institutional and Commerical Buildings

    • Main Campus of Hong Kong Institute of Education, Tai Po

      The work comprises the construction of two academic blocks, one administration block, one central facility block and extensive external and associated building works.

      Institutional and Commerical Buildings

top