Relocation of the Department of Justice to Central Government Offices (Main and East Wings)
Pamela Youde Nethersole Eastern Hospital Nurses Training School & Quarters and Senior Staff Quarters, Chai Wan
Radiotherapy Centre and Accident & Emergency Department at Princess Margaret Hospital
Castle Peak Hospital Redevelopment Phase II Stage 2
Building 7&8, Hong Kong Science Park
Welfare Complex at Lai King Headland, Lai Chi Ling Road, Kwai Tsing
Primary and Secondary School in Area 20 and Two Secondary Schools in Area 40, Tung Chung
Departmental Quarters at Hong Ning Road
Castle Peak Hospital Redevelopment Phase 2 Stage 1
Queen Mary Out-patient Clinic
Princess Margaret Specialist Outpatient Clinics
The Jockey Club Serene House of Castle Peak Hospital
MTRC Lantau and Airport Railway Main Depot in Siu Ho Wan
Main Campus of Hong Kong Institute of Education, Tai Po
Tsui Tsin Tong Building, Woodside Redevelopment, University of Hong Kong
Wong Chuk Hang Hospital
The University of Hong Kong Phase IV
Hong Kong Technical College, Tsing Yi
Tai A Chau Detention Centre
Shatin Hospital, Shatin
Marriott Hotel, Admiralty
Redevelopment of Kowloon Park, Tsim Sha Tsui
KCRC Lo Wu Terminal Station
Pacific Place Phase I, Admiralty
Relocation of the Department of Justice to Central Government Offices (Main and East Wings)
Refurbishment work to the existing eight-storey Main Wing and seven-storey East Wing of the former Central Government Office including associated E&M works, historic building preservation, landscaping, underground drainage and external works.
Institutional and Commercial Buildings
Pamela Youde Nethersole Eastern Hospital Nurses Training School & Quarters and Senior Staff Quarters, Chai Wan
The works comprise the construction of four 17-storey interlocking blocks, three high-rise blocks sitting on a common podium, as well as one 23-storey block and one 13-storey block.
Institutional and Commercial Buildings
Radiotherapy Centre and Accident & Emergency Department at Princess Margaret Hospital
Construction of a 12-storey block to house the Radiotherapy centre, the Accident & Emergency Department and other services with a total construction floor area of 22,883 square metres.
Institutional and Commercial Buildings
Castle Peak Hospital Redevelopment Phase II Stage 2
(1) Demolition of existing Block E & F, G & H and other miscellaneous structures; (2) Construction of a 5-storey Block E with a 5.3 metre depth basement & a 3-storey Block S (including design of piling & caps); and (3) Construction of miscellaneous structures including associated drainage and external works.
Institutional and Commercial Buildings
Building 7&8, Hong Kong Science Park
Construction of two seven-storey office buildings for research and development activities with a common basement for carparking and plant rooms, a service tunnel adjoining buildings including associated drainage and external works.
Institutional and Commercial Buildings
Welfare Complex at Lai King Headland, Lai Chi Ling Road, Kwai Tsing
Construction of a 9-storey purpose built building consisting of 400-place long stay care home, 80-place halfway house & 120-place sheltered workshop, including retaining wall and slope cutting works and associated drainage and external works.
Institutional and Commercial Buildings
Primary and Secondary School in Area 20 and Two Secondary Schools in Area 40, Tung Chung
Construction of One Primary School and Three Secondary Schools (ASD 2000 design, 30 classrooms) including the design and construction of the piled foundation and a structural system for the superstructure of the school blocks, and all associated building services installation; drainage and external works.
Institutional and Commercial Buildings
Departmental Quarters at Hong Ning Road
This project includes the design and construction of two residential blocks with landscaped podium and residents' clubhouse providing 584 government quarters and 156 private car parking spaces, including the piled foundation, building services, underground drainage, external and landscaping works.
Institutional and Commercial Buildings
Castle Peak Hospital Redevelopment Phase 2 Stage 1
This project includes the construction of one five-storey building, one two-storey building, a single-storey building services unit, a single pump house, a building services tunnel, demolition of an existing administration block as well as associated drainage and external works.
Institutional and Commercial Buildings
Queen Mary Out-patient Clinic
This project includes the construction of one 15-storey new Specialist Out-patient Clinic block and all associated building service installation and external works, modification of existing traffic circulation platform including two new link bridges of steel structure, an extension of a covered walkway and all associated building services and alternation works.
Institutional and Commercial Buildings
Princess Margaret Specialist Outpatient Clinics
This project includes the construction of one 11-storey specialist outpatient clinics, a reinforced concrete link bridge connecting to existing Nursing Staff Quarters, underground pump house and sump tanks, reinstatement of existing basketball court and minor alteration works to second floor of existing Nursing Staff Quarters including all associated building services and external works.
Institutional and Commercial Buildings
The Jockey Club Serene House of Castle Peak Hospital
This project includes the construction of a new two-storey building including footing, associated building services, drainage and external works.
Institutional and Commercial Buildings
MTRC Lantau and Airport Railway Main Depot in Siu Ho Wan
MTRC Lantau and Airport Railway Main Depot in Siu Ho Wan
Institutional and Commercial Buildings
Main Campus of Hong Kong Institute of Education, Tai Po
The work comprises the construction of two academic blocks, one administration block, one central facility block and extensive external and associated building works.
Institutional and Commercial Buildings
Tsui Tsin Tong Building, Woodside Redevelopment, University of Hong Kong
The work comprises the construction of an 11-storey academic building from caisson cap including a link bridge to Fung Ping Shan Museum and all building services and external works.
Institutional and Commercial Buildings
Wong Chuk Hang Hospital
The works comprise the construction of one 5-storey Infirmary Block and one 5-storey Care and Attention/Long Stay Care Block on a 2-storey podium, one 6-storey staff quarters building and all associated drainage and external works, the surfacing of access road, construction of associate footpath and pedestrian pavements including footings and pile caps.
Institutional and Commercial Buildings
The University of Hong Kong Phase IV
The works comprise the construction of an Academic Block (twin towers linked together by a 10-storey services core) and a 6-storey Amenities Building and all external works and building services work within the existing campus.
Institutional and Commercial Buildings
Hong Kong Technical College, Tsing Yi
The works comprise the construction of a seven-storey technical college with an overall height of 31.5 metres.
Institutional and Commercial Buildings
Tai A Chau Detention Centre
This project includes the design, supply and construction of 27 prefabricated buildings. It also includes sewage screening plant and the design, supply, installation, testing and commissioning of water supply installation from Shek Pik Reservoir to the site.
Institutional and Commercial Buildings
Shatin Hospital, Shatin
This project includes the construction of a 10-storey hospital building comprising 31,420 square metres of GFA.
Institutional and Commercial Buildings
Marriott Hotel, Admiralty
The project comprises the construction of a 50-storey hotel block with extensive electrical and mechanical installations and ancillary services.
Institutional and Commercial Buildings
Redevelopment of Kowloon Park, Tsim Sha Tsui
The redevelopment project comprises the construction of a swimming pool and a sports complex, one sensorama, piazza and bandstand playgrounds, sports pitches and other park facilities.
Institutional and Commercial Buildings
KCRC Lo Wu Terminal Station
This project comprises the construction of platform, canopies, a subway, some road and track works.
Institutional and Commercial Buildings
Pacific Place Phase I, Admiralty
The project comprises the construction of a 5-level podium structure for a hotel and a commercial tower with a 2-storey basement.
Institutional and Commercial Buildings